BUILDING ECONOMICS
GROUP MEMBERS :
PANG KAI YUN 0319802
SAM WEI YIN 0320364
TRACE GEW YEE 0320269
YEO KAI WEN 0319844
CHOW KAH YIEN 0320300
AUDREY TING 0320247
TAN HWEE MIN 0326057
COST APPRAISAL
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Lot 160, Jalan Robson, Jalan Syed Putra, Kuala Lumpur.
Seputeh Heights Thean Hou Temple
Methodist College Kuen Cheng High School
University Malaya Medical Centre Pantai Hospital
Mid Valley Mall Bangsar Village
KL Sentral
LRT
KTM
Monorail
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Car Park Podium & Basement Level
- 6 Levels of elevated car park + 2 levels of basement car park;
- Podium’s CFA is 25,799.87m2; GFA is 23,883.56 m2
- Basement’s CFA is 8,685.92 m2; GFA is 7,751.81 m2
- 656 of Car Park units available
- Podium - 477 Units; Basement- 179 Units
- Ground Floor – Mechanical Level;
Entrance lobby with water feature and water curtain;
- Lounge; Mail room; Nursery at Tower B
Facility Level (Level 7)
Up to more than 10 facilities such as:
- Dining Cafe - Gym Room
- Infinity Pool - Wading Pool
- Floating Deck - Yoga Deck
- Audio Visual Room - Meeting Room
- Playground - Outdoor Seating
- Convenient Store - Sky Jacuzzi
- Changing Room - Surau
- Laundry - Game Room /
Mini Library
Total CFA is 3,392.66 m2; GFA is 927.41 m2
Residential Tower ( Tower A & Tower B )
- 404 Units (Tower A & Tower B - 202 units each )
- Residential level from Level 8 to Level 38
- Total CFA for both tower is 54,436 m2
- Total GFA for both tower is 43,841 m2
Residential Units
- Each tower features a total of 188 Typical Units from
Level 8 to Level 34.
- A total of 14 Duplex Units from Level 35 to Level 36;
Level 37 to Level 38
- Floor height for all floors are approximate 3.40 m height
- Each floor has 7 types of residential unit.
- Every unit designed with high quality finishes
Roof Facility Level
The highest floor, Level 38
Roof facilities provided such as:
(A) Roof Garden
(B) Sky Lounge
(C) Audio Visual Room
A
B C
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
LEVEL CFA (m2) GFA (m2) NFA (m2)
Basement Carpark 8,685.92 7,751.81 -
Podium Carpark 29,192.53 24,810.96 -
Tower A 27,364.36 22,039.41 16,011.05
Tower B 27,071.72 21,801.67 15,727.23
TOTAL : 92,314.53 76,403.85 31,738.28
Element CFA (m2)
Estimated Construction
Cost (RM)
Percentage
Cost per m2 of
CFA (RM)
Cost per ft2 of
CFA (RM)
Basement Carpark 8,686 17,612,452.34 12% 2,027.70 188.38
Podium Carpark 29,193 25,172,941.81 17% 862.31 80.11
Tower A 27,364 54,118,728.31 36% 1,977.71 183.73
Tower B 27,072 53,535,276.42 36% 1,977.54 183.72
TOTAL : 92,315 150,439,398.88 100% 1,629.64 151.40
Element
Estimated Construction
Cost (RM)
Percentage
Cost per m2 of
CFA (RM)
Cost per ft2 of
CFA (RM)
Structure 65,455,469.49 44% 709.05 65.87
Architectural 44,595,575.93 30% 483.08 44.88
M&E 40,388,353.47 27% 437.51 40.65
TOTAL : 150,439,398.88 100% 1,629.64 151.40
No. Element CFA (m2)
Estimated Construction
Cost (RM)
Percentage
Cost per m2 of
CFA (RM)
Cost per ft2 of
CFA (RM)
A Basement Carpark 8,686 17,612,452.34 10% 2,027.70 188.38
B Podium Carpark 29,193 25,172,941.81 14% 862.31 80.11
C Tower A 27,364 54,118,728.31 30% 1,977.71 183.73
D Tower B 27,072 53,535,276.42 30% 1,977.54 183.72
E External & Ancillary Work 4,870,000.00 3% 52.21 4.85
F Preliminaries (10% of A-E) 15,530,939.89 9%
G Contingencies (5% of A-E) 7,765,469.94 4%
SUB-TOTAL : 92,315 178,605,808.72 100% 1,934.75 179.74
H Cost Escalation (5% of A-G) 8,930,290.44
TOTAL : 92,315 187,536,099.15 2,031.49 188.73
Total CFA = 92,315 m2
Total Cost = RM 187,536,099.15
Cost per m2 CFA = RM2,031.49
CONCLUSION
THANK YOU !

More Related Content

PPTX
B.E assignment
DOCX
Hossam elmawardy
DOC
Hassan mohamed chief mech eng cv
PPTX
Building Economics Presentation
PDF
Adim Industrial Group co
PPTX
Be presentation slides
PPTX
Building Economics Presentation
PDF
The tower (office) gold land
B.E assignment
Hossam elmawardy
Hassan mohamed chief mech eng cv
Building Economics Presentation
Adim Industrial Group co
Be presentation slides
Building Economics Presentation
The tower (office) gold land

Similar to Assignment - Preliminary Cost Appraisal (Presentation Slide) (20)

PPTX
Group-3 2222222222222222222222222222pptx
PPTX
Group-3 2222222222222222222222222222pptx
PDF
Trion Kuala Lumpur
PDF
ECA Presentation
PPT
Zaah Teleport
DOCX
Omaxe the lake new chandigarh
PPTX
L'Avenue Office & Apartment
PDF
ECA form
PPT
Palm beach villas panglao tower presentation kit
PDF
BE COST APPRAISAL
PPTX
Career Portfolio Jae Yoon Kim
PDF
cost appraisal
PPTX
Be presentation rev
PPTX
BE presentation slides
PPTX
Building economics presentation 3 2
PDF
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
PPTX
PPTX
Presentation.pptx jkjkjkdskjklds.sdf212fs
PDF
DownloadPfdFile.aspx.pdf
PDF
Electrical system design of garden project at belhaven (10 Storey High Rise B...
Group-3 2222222222222222222222222222pptx
Group-3 2222222222222222222222222222pptx
Trion Kuala Lumpur
ECA Presentation
Zaah Teleport
Omaxe the lake new chandigarh
L'Avenue Office & Apartment
ECA form
Palm beach villas panglao tower presentation kit
BE COST APPRAISAL
Career Portfolio Jae Yoon Kim
cost appraisal
Be presentation rev
BE presentation slides
Building economics presentation 3 2
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
Presentation.pptx jkjkjkdskjklds.sdf212fs
DownloadPfdFile.aspx.pdf
Electrical system design of garden project at belhaven (10 Storey High Rise B...
Ad

More from Kai Yun Pang (20)

PDF
Assignment 2 - Resort Proposal at Pulau Langkawi
PDF
Assignment 2 - Report
PDF
Assignment 1 - Water Pump Station
PDF
Assignment 1 - Microsoft Project
PDF
Assignment - Financial Appraisal
PDF
Assignment - Financial Appraisal
PDF
Assignment - FIDIC Contract
PDF
Assignment - Report
PDF
Seminar - CIPAA 2012
PDF
Assignment - S Hotel (Presentation Slide)
PDF
Assignment - S Hotel
PDF
Assignment - Case Study Report
PDF
Assignment - Journal
PPTX
Assignment - Community Service
PDF
Assignment - Final Account
PDF
Assignment - Report
PDF
Seminar - Partial Possession by Employer
PDF
Seminar - Question
PDF
Assignment - MK Land
DOCX
Assignment - Financial Analysis
Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Report
Assignment 1 - Water Pump Station
Assignment 1 - Microsoft Project
Assignment - Financial Appraisal
Assignment - Financial Appraisal
Assignment - FIDIC Contract
Assignment - Report
Seminar - CIPAA 2012
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel
Assignment - Case Study Report
Assignment - Journal
Assignment - Community Service
Assignment - Final Account
Assignment - Report
Seminar - Partial Possession by Employer
Seminar - Question
Assignment - MK Land
Assignment - Financial Analysis
Ad

Recently uploaded (20)

PDF
Weekly quiz Compilation Jan -July 25.pdf
PPTX
Cell Types and Its function , kingdom of life
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PPTX
Pharma ospi slides which help in ospi learning
PDF
Yogi Goddess Pres Conference Studio Updates
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
master seminar digital applications in india
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PDF
Anesthesia in Laparoscopic Surgery in India
PPTX
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PDF
01-Introduction-to-Information-Management.pdf
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PDF
Computing-Curriculum for Schools in Ghana
PDF
O7-L3 Supply Chain Operations - ICLT Program
PDF
FourierSeries-QuestionsWithAnswers(Part-A).pdf
Weekly quiz Compilation Jan -July 25.pdf
Cell Types and Its function , kingdom of life
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
Pharmacology of Heart Failure /Pharmacotherapy of CHF
Pharma ospi slides which help in ospi learning
Yogi Goddess Pres Conference Studio Updates
Final Presentation General Medicine 03-08-2024.pptx
master seminar digital applications in india
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
human mycosis Human fungal infections are called human mycosis..pptx
Anesthesia in Laparoscopic Surgery in India
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
Supply Chain Operations Speaking Notes -ICLT Program
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
01-Introduction-to-Information-Management.pdf
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
Computing-Curriculum for Schools in Ghana
O7-L3 Supply Chain Operations - ICLT Program
FourierSeries-QuestionsWithAnswers(Part-A).pdf

Assignment - Preliminary Cost Appraisal (Presentation Slide)

  • 1. BUILDING ECONOMICS GROUP MEMBERS : PANG KAI YUN 0319802 SAM WEI YIN 0320364 TRACE GEW YEE 0320269 YEO KAI WEN 0319844 CHOW KAH YIEN 0320300 AUDREY TING 0320247 TAN HWEE MIN 0326057 COST APPRAISAL
  • 3. Lot 160, Jalan Robson, Jalan Syed Putra, Kuala Lumpur.
  • 4. Seputeh Heights Thean Hou Temple Methodist College Kuen Cheng High School
  • 5. University Malaya Medical Centre Pantai Hospital Mid Valley Mall Bangsar Village
  • 14. Car Park Podium & Basement Level - 6 Levels of elevated car park + 2 levels of basement car park; - Podium’s CFA is 25,799.87m2; GFA is 23,883.56 m2 - Basement’s CFA is 8,685.92 m2; GFA is 7,751.81 m2 - 656 of Car Park units available - Podium - 477 Units; Basement- 179 Units - Ground Floor – Mechanical Level; Entrance lobby with water feature and water curtain; - Lounge; Mail room; Nursery at Tower B
  • 15. Facility Level (Level 7) Up to more than 10 facilities such as: - Dining Cafe - Gym Room - Infinity Pool - Wading Pool - Floating Deck - Yoga Deck - Audio Visual Room - Meeting Room - Playground - Outdoor Seating - Convenient Store - Sky Jacuzzi - Changing Room - Surau - Laundry - Game Room / Mini Library Total CFA is 3,392.66 m2; GFA is 927.41 m2
  • 16. Residential Tower ( Tower A & Tower B ) - 404 Units (Tower A & Tower B - 202 units each ) - Residential level from Level 8 to Level 38 - Total CFA for both tower is 54,436 m2 - Total GFA for both tower is 43,841 m2 Residential Units - Each tower features a total of 188 Typical Units from Level 8 to Level 34. - A total of 14 Duplex Units from Level 35 to Level 36; Level 37 to Level 38 - Floor height for all floors are approximate 3.40 m height - Each floor has 7 types of residential unit. - Every unit designed with high quality finishes
  • 17. Roof Facility Level The highest floor, Level 38 Roof facilities provided such as: (A) Roof Garden (B) Sky Lounge (C) Audio Visual Room A B C
  • 23. LEVEL CFA (m2) GFA (m2) NFA (m2) Basement Carpark 8,685.92 7,751.81 - Podium Carpark 29,192.53 24,810.96 - Tower A 27,364.36 22,039.41 16,011.05 Tower B 27,071.72 21,801.67 15,727.23 TOTAL : 92,314.53 76,403.85 31,738.28
  • 24. Element CFA (m2) Estimated Construction Cost (RM) Percentage Cost per m2 of CFA (RM) Cost per ft2 of CFA (RM) Basement Carpark 8,686 17,612,452.34 12% 2,027.70 188.38 Podium Carpark 29,193 25,172,941.81 17% 862.31 80.11 Tower A 27,364 54,118,728.31 36% 1,977.71 183.73 Tower B 27,072 53,535,276.42 36% 1,977.54 183.72 TOTAL : 92,315 150,439,398.88 100% 1,629.64 151.40
  • 25. Element Estimated Construction Cost (RM) Percentage Cost per m2 of CFA (RM) Cost per ft2 of CFA (RM) Structure 65,455,469.49 44% 709.05 65.87 Architectural 44,595,575.93 30% 483.08 44.88 M&E 40,388,353.47 27% 437.51 40.65 TOTAL : 150,439,398.88 100% 1,629.64 151.40
  • 26. No. Element CFA (m2) Estimated Construction Cost (RM) Percentage Cost per m2 of CFA (RM) Cost per ft2 of CFA (RM) A Basement Carpark 8,686 17,612,452.34 10% 2,027.70 188.38 B Podium Carpark 29,193 25,172,941.81 14% 862.31 80.11 C Tower A 27,364 54,118,728.31 30% 1,977.71 183.73 D Tower B 27,072 53,535,276.42 30% 1,977.54 183.72 E External & Ancillary Work 4,870,000.00 3% 52.21 4.85 F Preliminaries (10% of A-E) 15,530,939.89 9% G Contingencies (5% of A-E) 7,765,469.94 4% SUB-TOTAL : 92,315 178,605,808.72 100% 1,934.75 179.74 H Cost Escalation (5% of A-G) 8,930,290.44 TOTAL : 92,315 187,536,099.15 2,031.49 188.73
  • 27. Total CFA = 92,315 m2 Total Cost = RM 187,536,099.15 Cost per m2 CFA = RM2,031.49 CONCLUSION