SCHOOL OF ARCHITECTURE , BUILDING & DESIGN
BACHELOR OF SCIENCE ( ARCHITECTURE )
BUILDING SCIENCE 2 [ BLD 61303 ]
PROJECT 2 - INTEGRATION PROJECT
TUTOR - MR AZIM
CHIA WEE MIN
0315186
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
TABLE OF CONTENT
1.0 Introduction To Studio Design
2.0 Lighting
2.1 Artificial Lighting For Discussion Room
2.2 Artificial Lighting For Cafe
2.3 Ecotect for Cafe
2.4 PSALI for Discussion Room
2.5 PSALI for Cafe
3.0 Acoustic
3.1 Reverberation Time for Discussion Room
3.2 Sound Reduction Index for Cafe
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
1.0 INTRODUCTION TO STUDIO DESIGN
NAME COMMUNITY LIBRARY IN SENTUL
LOCATION JALAN HAJI SALLEH
FUNCTION FUNCTIONED AS A COMMUNITY LIBRARY BUT ALSO REACT WITH
PUBLIC REALM
DESIGN STATEMENT LIBRARY AREA AROUND 1800 M2 TO 2000 M2
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
2.0 ARTIFICIAL LIGHTING
2.1 ARTIFICIAL LIGHTING FOR DISCUSSION ROOM ( 2ND FLOOR )
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
DISCUSSION ROOM
LIGHT TYPE ( Philips Down Light )
General Specs
Application Down light
Color White
Material Aluminum & Synthetics
Lamp Base & wattage LED 12 W
Color Temperature 2700K, 6500K
Dimensions ( L x W x H ) 132 x 132 x 81 mm
Lumen 1680 lm
Dimension Of Zone (m) 5 x 3
Total Floor Area / A (m2) 15 m2
Type Of Lighting Fixture Ceiling
Lumen Of Lighting
Fixtures / F (Lm)
1680 Lm
Height Of Luminaire (M) 3.4 m
Work Level (M) 0.8 m
Component Material Colour
Surface
Finishes
Reflectance
Value ( %)
Wall
Concrete Dark Grey Matte 15
Clear Glass Transparent Glossy 8
Aluminium
Frame Black Matte 10
Door
Glass Door Transparent Glossy 8
Aluminium
Frame Black Matte 10
Floor
Laminated
Wood Parquet Light Brown Glossy 35
Furniture
Wooden Chair Brown Matte 30
Wooden Table Brown Matte 30
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
Mounting Height / H
( Hm)
2.6 m
Assumption Of
Reflectance Value
Ceiling = 0.7 Wall = 0.5 Floor = 0.2
Room Index / RI
𝑅𝐼 =
( 𝐿 × 𝑊 )
𝐻𝑚 ( 𝐿 + 𝑊 )
𝑅𝐼 =
(15)
2.6 (5 + 3 )
= 0.72
Utilization Factor / UF 0.34
Maintenance Factor /
MF
0.8
Illuminance Level / E
( Lux ) ( Ms1525 )
150
Number Of Lighting
Fixture / N
𝑁 =
𝐸 × 𝐴
( 𝐹 × 𝑈𝐹 × 𝑀𝐹 )
𝑁 =
150 × 15
( 1680 × 0.34 × 0.8 )
= 5
Fitting layout by
approximately / m
Smax = 1.0 x Hm
= 1.0 x 2.6
= 2.6 m
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
2.2 ARTIFICIAL LIGHTING FOR CAFE ( FIRST FLOOR )
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
CAFE
LIGHT TYPE ( Philips Down Light )
General Specs
Application Down light
Color White
Material Aluminum & Synthetics
Lamp Base & wattage LED 12 W
Color Temperature 2700K, 6500K
Dimensions ( L x W x H ) 132 x 132 x 81 mm
Lumen 1680 lm
Dimension Of Zone (m) 7.3 x 14
Total Floor Area / A (m2) 102.2 m2
Type Of Lighting Fixture Ceiling
Lumen Of Lighting
Fixtures / F (Lm)
1680 Lm
Height Of Luminaire (M) 3.4 m
Work Level (M) 0.8 m
Component Material Colour
Surface
Finishes
Reflectance
Value ( %)
Wall
Concrete Dark Grey Matte 15
Clear Glass Transparent Glossy 8
Aluminium
Frame Black Matte 10
Door
Glass Door Transparent Glossy 8
Aluminium
Frame Black Matte 10
Floor
Laminated
Wood Parquet Light Brown Glossy 35
Furniture
Wooden Chair Brown Matte 30
Wooden Table Brown Matte 30
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
Mounting Height / H
( Hm)
2.6 m
Assumption Of
Reflectance Value
Ceiling = 0.7 Wall = 0.5 Floor = 0.2
Room Index / RI
𝑅𝐼 =
( 𝐿 × 𝑊 )
𝐻𝑚 ( 𝐿 + 𝑊 )
𝑅𝐼 =
(102.2)
2.6 (7 + 14 )
= 2.2
Utilization Factor / UF 0.46
Maintenance Factor /
MF
0.8
Illuminance Level / E
( Lux ) ( Ms1525 )
100
Number Of Lighting
Fixture / N
𝑁 =
𝐸 × 𝐴
( 𝐹 × 𝑈𝐹 × 𝑀𝐹 )
𝑁 =
100 × 102.2
( 1680 × 0.46 × 0.8 )
= 17
Fitting layout by
approximately / m
Smax = 1.0 x Hm
= 1.0 x 2.6
= 2.6 m
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
2.3 ECOTECT FOR CAFE ( FIRST FLOOR )
DAYTIME ARTIFICIAL LIGHT
According to diagram above, area
near the front and back received
more natural daylight compare to
the middle part. Hence the
intensity is the highest
According to diagram above, it shows that
from blue to yellow represents the intensity of
light from low to high and the brightest is in
the middle of the cafe as there will not receive
any natural daylight. Hence, the artificial lights
focus on the middle part of the cafe.
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
2.4 PSALI FOR DISCUSSION ROOM ( 2ND FLOOR )
Lighting arrangement for the discussion room. As the discussion room receive natural
daylight from 3 faces, the natural daylight that penetrate will lit up half of the
discussion room. According to MS1525, discussion room requires 150 Lux and
therefore min 5 nos of lights are required. For this discussion room, there are 6 nos of
lights placed and controlled by two switches.
During daytime, as half of the discussion room will receive the natural daylight, only
switch 2 is switched on to get enough luminance for the discussion room. During night
time, the space will not get any natural daylight so all of the lights are switched on.
This layout arrangement for the lighting is to reduce the amount of energy waste to lit
up the room during day.
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
2.5 PSALI FOR CAFE ( FIRST FLOOR )
For cafe, there are 3 switches controlling the lights . during daytime, switch 1 and
switch 3 can be switched off as there are natural daylight penetrating into the space.
As for night time, all the lights are on as there will be no natural daylight penetrating
into the space.
Lighting arrangement for cafe. As the cafe
receive natural daylight at the front and back ,
the natural daylight that penetrate through will lit
up the front and back part of the cafe while the
middle part of the cafe will receive minimum
daylight. According to MS1525, cafe requires 100
Lux and therefore min 17 nos of lights are
required. For the cafe, there are 18 nos of lights
and 3 switches controlling 6 light each.
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
3.0 ACOUSTIC
3.1 REVERBERATION TIME FOR DISCUSSION ROOM ( 2nd FLOOR )
Volume for Discussion Room
= 5m x 3m
= 15 m2
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
REVERBERATION TIME (DISCUSSION ROOM) at 500 Hz during NON PEAK
Volume for Discussion Room
= 15 x 4
= 60 m3
𝑅𝑇 = 0.16 ×
𝑉𝑜𝑙𝑢𝑚𝑒𝑜𝑓𝑠𝑝𝑎𝑐𝑒
𝐴𝑏𝑠𝑜𝑟𝑝𝑡𝑖𝑜𝑛𝑎𝑟𝑒𝑎
𝑅𝑇 = 0.16 ×
60
9.948
𝑅𝑇 = 𝟎. 𝟗𝟕𝒔
The reverberation time for Discussion Room at 500 Hz for non-peak hour with 4 persons
occupying the space is 0.97 s which falls within the comfort reverberation time between
0.8s - 1.3s. This show that the acoustic absorption within this space is sufficient.
Component Material
Absorption
Coefficient ( 500
Hz ) , S Area ( m2 ), A
Sound
Absorption ( SA )
Wall
Concrete 0.05 12 0.6
Clear
Glass 0.1 29.6 2.96
Aluminum
Frame 0.25 2.4 0.6
Door
Glass Door 0.1 21.6 2.16
Aluminum
Frame 0.25 0.84 0.21
Floor
Laminated
Wood
Parquet 0.07 15 1.05
Furniture
Wooden
Chair 0.1 2.4 0.24
Wooden
Table 0.1 2.88 0.288
Occupant ( non
Peak ) 0.46 4 1.84
Total Absorption 9.948
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
REVERBERATION TIME (DISCUSSION ROOM) at 500 Hz during PEAK
Component Material
Absorption
Coefficient ( 500
Hz ) , S Area ( m2 ), A
Sound Absorption
( SA )
Wall
Concrete 0.05 12 0.6
Clear Glass 0.1 29.6 2.96
Aluminum Frame 0.25 2.4 0.6
Door
Glass Door 0.1 21.6 2.16
Aluminum Frame 0.25 0.84 0.21
Floor
Laminated Wood
Parquet 0.07 15 1.05
Furniture Wooden Chair 0.1 2.4 0.24
Wooden Table 0.1 2.88 0.288
Occupant
( Peak ) 0.46 8 3.68
Total Absorption 11.788
Volume for Discussion Room
= 15 x 4
= 60 m3
𝑅𝑇 = 0.16 ×
𝑉𝑜𝑙𝑢𝑚𝑒𝑜𝑓𝑠𝑝𝑎𝑐𝑒
𝐴𝑏𝑠𝑜𝑟𝑝𝑡𝑖𝑜𝑛𝑎𝑟𝑒𝑎
𝑅𝑇 = 0.16 ×
60
11.79
𝑅𝑇 = 𝟎. 𝟖𝟏𝒔
The reverberation time for Zone 1 at 500 Hz for peak hour with 8 persons occupying
the space is 0.81 s which falls within the comfort reverberation time between 0.8s -
1.3s. This shows that the acoustic absorption within this space is sufficient.
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
REVERBERATION TIME (DISCUSSION ROOM) at 2000 Hz during NON PEAK
Component Material
Absorption
Coefficient ( 2000
Hz ) , S Area ( m2 ), A
Sound Absorption
( SA )
Wall
Concrete 0.05 12 0.6
Clear Glass 0.07 29.6 2.072
Aluminum Frame 0.25 2.4 0.6
Door
Glass Door 0.07 21.6 1.512
Aluminum Frame 0.25 0.84 0.21
Floor
Laminated Wood
Parquet 0.06 15 0.9
Furniture Wooden Chair 0.1 2.4 0.24
Wooden Table 0.1 2.88 0.288
Occupant
( non Peak ) 0.51 4 2.04
Total Absorption 8.462
Volume for Discussion Room
= 15 x 4
= 60 m3
𝑅𝑇 = 0.16 ×
𝑉𝑜𝑙𝑢𝑚𝑒𝑜𝑓𝑠𝑝𝑎𝑐𝑒
𝐴𝑏𝑠𝑜𝑟𝑝𝑡𝑖𝑜𝑛𝑎𝑟𝑒𝑎
𝑅𝑇 = 0.16 ×
60
8.46
𝑅𝑇 = 𝟏. 𝟏𝟑𝒔
The reverberation time for Zone 1 at 2000 Hz for non-peak hour with 4 persons
occupying the space is 1.13 s which falls within the comfort reverberation time
between 0.8s - 1.3s. This shows that the acoustic absorption within this space is
sufficient.
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
REVERBERATION TIME (DISCUSSION ROOM) at 2000 Hz during PEAK
Volume for Discussion Room
= 15 x 4
= 60 m3
𝑅𝑇 = 0.16 ×
𝑉𝑜𝑙𝑢𝑚𝑒𝑜𝑓𝑠𝑝𝑎𝑐𝑒
𝐴𝑏𝑠𝑜𝑟𝑝𝑡𝑖𝑜𝑛𝑎𝑟𝑒𝑎
𝑅𝑇 = 0.16 ×
60
10.502
𝑅𝑇 = 𝟎. 𝟗𝟏𝒔
The reverberation time for Zone 1 at 2000 Hz for peak hour with 8 persons occupying
the space is 0.91 s which falls within the comfort reverberation time between 0.8s -
1.3s. This shows that the acoustic absorption within this space is sufficient.
Component Material
Absorption
Coefficient
( 2000 Hz ) , S Area ( m2 ), A Sound Absorption ( SA )
Wall
Concrete 0.05 12 0.6
Clear Glass 0.07 29.6 2.072
Aluminum Frame 0.25 2.4 0.6
Door
Glass Door 0.07 21.6 1.512
Aluminum Frame 0.25 0.84 0.21
Floor
Laminated Wood
Parquet 0.06 15 0.9
Furniture Wooden Chair 0.1 2.4 0.24
Wooden Table 0.1 2.88 0.288
Occupant
(Peak ) 0.51 8 4.08
Total Absorption 10.502
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
3.2 SOUND REDUCTION INDEX FOR CAFE ( FIRST FLOOR )
Sound reduction index (SRI) is used to measure the level of sound insulation provided by
structure such as wall, window, door, or ventilator.
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
TRANSMISSION LOSS (CAFE)
Transmission Coefficient of material,
Building Element Material Surface Area (m2 ) SRI (dB)
Wall Concrete 101.7 42
Window
Clear Glass 46 26
Aluminum Frame 2 44
Door
Glass Door 43.8 26
Aluminum Frame 3.6 44
𝑆𝑅𝐼 = 10 𝑙𝑜𝑔
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑐𝑜𝑒𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑡
1. Concrete Wall
𝑆𝑅𝐼 = 10 𝑙𝑜𝑔
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑤𝑎𝑙𝑙
42 = 10 𝑙𝑜𝑔
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑤𝑎𝑙𝑙
log 4.2 =
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑤𝑎𝑙𝑙
𝑻𝒓𝒂𝒏𝒔𝒎𝒊𝒔𝒔𝒊𝒐𝒏𝑾𝒂𝒍𝒍 = 𝟔. 𝟑𝟏 × 𝟏𝟎−𝟓
2. Clear Glass Wall
𝑆𝑅𝐼 = 10 𝑙𝑜𝑔
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑔𝑙𝑎𝑠𝑠𝑤𝑎𝑙𝑙
26 = 10 𝑙𝑜𝑔
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑔𝑙𝑎𝑠𝑠𝑤𝑎𝑙𝑙
log 2.6 =
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑔𝑙𝑎𝑠𝑠𝑤𝑎𝑙𝑙
𝑻𝒓𝒂𝒏𝒔𝒎𝒊𝒔𝒔𝒊𝒐𝒏𝑮𝒍𝒂𝒔𝒔𝑾𝒂𝒍𝒍 = 𝟐. 𝟓𝟏 × 𝟏𝟎−𝟑
3. Aluminum Frame Wall
𝑆𝑅𝐼 = 10 𝑙𝑜𝑔
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑤𝑖𝑛𝑑𝑜𝑤𝑓𝑟𝑎𝑚𝑒
44 = 10 𝑙𝑜𝑔
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑤𝑖𝑛𝑑𝑜𝑤𝑓𝑟𝑎𝑚𝑒
log 4.4 =
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑤𝑖𝑛𝑑𝑜𝑤𝑓𝑟𝑎𝑚𝑒
𝑻𝒓𝒂𝒏𝒔𝒎𝒊𝒔𝒔𝒊𝒐𝒏𝑾𝒊𝒏𝒅𝒐𝒘𝑭𝒓𝒂𝒎𝒆 = 𝟑. 𝟗𝟖 × 𝟏𝟎−𝟓
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
4. Glass Door
𝑆𝑅𝐼 = 10 𝑙𝑜𝑔
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑔𝑙𝑎𝑠𝑠𝑑𝑜𝑜𝑟
26 = 10 𝑙𝑜𝑔
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑔𝑙𝑎𝑠𝑠𝑑𝑜𝑜𝑟
log 2.6 =
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑔𝑙𝑎𝑠𝑠𝑑𝑜𝑜𝑟
𝑻𝒓𝒂𝒏𝒔𝒎𝒊𝒔𝒔𝒊𝒐𝒏𝑮𝒍𝒂𝒔𝒔𝑫𝒐𝒐𝒓 = 𝟐. 𝟓𝟏 × 𝟏𝟎−𝟑
5. Aluminum Frame Door
𝑆𝑅𝐼 = 10 𝑙𝑜𝑔
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑑𝑜𝑜𝑟𝑓𝑟𝑎𝑚𝑒
44 = 10 𝑙𝑜𝑔
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑑𝑜𝑜𝑟𝑓𝑟𝑎𝑚𝑒
log 4.4 =
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑑𝑜𝑜𝑟𝑓𝑟𝑎𝑚𝑒
𝑻𝒓𝒂𝒏𝒔𝒎𝒊𝒔𝒔𝒊𝒐𝒏𝑫𝒐𝒐𝒓𝑭𝒓𝒂𝒎𝒆 = 𝟑. 𝟗𝟖 × 𝟏𝟎−𝟓
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
SOUND REDUCTION INDEX CALCULATION (CAFÉ)
𝑆𝑅𝐼 = 10 𝑙𝑜𝑔
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑜𝑣𝑒𝑟𝑎𝑙𝑙
𝑇𝑜𝑣𝑒𝑟𝑎𝑙𝑙 =
𝑆 𝑛 ∗ 𝑇𝑛
𝑇𝑜𝑡𝑎𝑙 𝑠𝑢𝑟𝑓𝑎𝑐𝑒 𝑎𝑟𝑒𝑎
𝑇𝑜𝑣𝑒𝑟𝑎𝑙𝑙
=
6.42 × 10−4
+ 1.15 × 10−1
+ 7.96 × 10−5
+ 1.10 × 10−1
+ 1.43 × 10−4
197.1
= 1.15 x 10 -3
𝑆𝑅𝐼 = 10 𝑙𝑜𝑔
1
𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑜𝑣𝑒𝑟𝑎𝑙𝑙
𝑆𝑅𝐼 = 10 𝑙𝑜𝑔
1
1.15 × 10−3
𝑆𝑅𝐼 = 10 log
1
1.15 × 10−3
SRI = 29.4 dB
Based on the calculation, the sound reduction index value of the whole open space of
the cafe is 29.4 dB.
Sound Reduction
Index
Hearing Conditions
35 dB or less
Normal speech can be understood quite easily and distinctly
through the walls
35 to 40 dB
Loud speech can be understood fairly well. Normal speech can be
heard but not easily understood
40 to 45 dB
Loud speech can be heard, but it is not easily intelligible. Normal
speech can be heard only faintly, if at all.
Material SRI ( dB )
Surface area
( m2 ) ( S)
Transmission
Coefficient ( T) ST
Concrete 42 101.7 6.31 x 10 -5 6.42 x 10 -4
Clear
glass 26 46 2.51 x 10 -3 1.15 x 10 -1
Aluminum
Frame 44 2 3.98 x 10 -5 7.96 x 10 -5
Glass
Door 26 43.8 2.51 x 10 -3 1.10 x 10 -1
Aluminum
Frame 44 3.6 3.98 x 10 -5 1.43 x 10 -4
197.1
Building Science 2 Project 2 Integration Project
Chia Wee Min 0315186
45 to 50 dB
Loud speech can be faintly heard but not understood. Normal
speech is inaudible
55 dB or greater
Very loud sounds, such as loud singing, brass musical instruments or a
radio at full volume can be heard faintly or not at all.
According to the general sound environment, the value is categorized as less than 35dB
which is loud according to the normal conversation and can be heard distinctly through
the walls. This cafe spaces uses variety of materials such as concrete, glass, and
aluminum. To be able to achieve better acoustic absorption, the balance use of
effective materials is important, it helps the overall reduction of sound transmission
between spaces.

More Related Content

DOCX
Building science 2
PDF
REPORT AND CALCULATION
PDF
Bscience report
DOCX
Final l
DOCX
Building Science 2 (Project 2)
PDF
Bb science project 2
PDF
Lighting and Acoustic Performance - Absolute Coffee
PDF
Building Science 1 (Project 1)
Building science 2
REPORT AND CALCULATION
Bscience report
Final l
Building Science 2 (Project 2)
Bb science project 2
Lighting and Acoustic Performance - Absolute Coffee
Building Science 1 (Project 1)

What's hot (20)

PDF
Mantra outdoor edition 2
PDF
Project 1-Lighting & Acoustic Performance Evaluation and Design
PDF
Bscience board
PDF
B.science report 1.2
PDF
Lighting & Acoustic Performance Evaluation and Design
PDF
Bscience Final report
PDF
Building Science Report
PDF
Light Analysis of Building Science II
PDF
Project 2 integration project
PDF
Final bsc
PDF
B science 2 project 1
PDF
Lighting proposal
PDF
Building science 2 project 1
PDF
Building science 2 project 2 light integration
PDF
Building Science II : Project 1
PDF
BUILDING SCIENCE II: ACOUSTICS AND LIGHTING ANALYSIS OF DONUTES CAFE, SS15
PDF
Building science 2 final report
PDF
Bscience project 2
PDF
Building Science II
PDF
Building Science Report
Mantra outdoor edition 2
Project 1-Lighting & Acoustic Performance Evaluation and Design
Bscience board
B.science report 1.2
Lighting & Acoustic Performance Evaluation and Design
Bscience Final report
Building Science Report
Light Analysis of Building Science II
Project 2 integration project
Final bsc
B science 2 project 1
Lighting proposal
Building science 2 project 1
Building science 2 project 2 light integration
Building Science II : Project 1
BUILDING SCIENCE II: ACOUSTICS AND LIGHTING ANALYSIS OF DONUTES CAFE, SS15
Building science 2 final report
Bscience project 2
Building Science II
Building Science Report
Ad

Similar to Final report bsc 2 (20)

PDF
BUILDING SCIENCE INTEGRATION PROJECT
PPTX
Bs calculation
PPTX
Building Science 2
PDF
Building science-2-report
PDF
Building Science 2
DOCX
B science II Report
PDF
B science project 2
PDF
Project 2 Building Science
PDF
B science integration
PDF
Bscience report
PDF
Bscience ii
DOCX
CALCULATION
PDF
BUILDING SCIENCE II INDIVIDUAL REPORT
PPTX
Building Science II
PDF
Project 2: Integration Project
PDF
Building Science Project 2 Report
PDF
Building Science 2 Project 2 Report
PDF
Building Science Project 2
PDF
BUILDING SCIENCE 2 PROJECT 2 REPORT
PDF
Building Science P02
BUILDING SCIENCE INTEGRATION PROJECT
Bs calculation
Building Science 2
Building science-2-report
Building Science 2
B science II Report
B science project 2
Project 2 Building Science
B science integration
Bscience report
Bscience ii
CALCULATION
BUILDING SCIENCE II INDIVIDUAL REPORT
Building Science II
Project 2: Integration Project
Building Science Project 2 Report
Building Science 2 Project 2 Report
Building Science Project 2
BUILDING SCIENCE 2 PROJECT 2 REPORT
Building Science P02
Ad

More from Wm Chia (20)

PDF
Edchewgroup
PDF
btech project 02 report
DOCX
Synopsis 4 kenneth
PDF
Synopsis 3 geometry of feeling
DOCX
Synopsis 2 semiotics and architecture
PDF
Cognitiv essay
PPTX
Axxu group
DOCX
Final case study tropical box house
DOCX
Topic issue proposal egg crate new
PPTX
Asian architecture slides
DOCX
Cnc report
DOCX
Self concept social psychology journal 01 #1 compile
PPTX
Social psy presentation slide 1 new
DOCX
Psy final report
DOCX
Self serving bias social psychology journal 01 #2
DOCX
The effect of color social psychology journal 01 #3
DOCX
Psychology
DOCX
Self concept social psychology journal 01 #1
DOCX
Psycho journal 02 latest
DOCX
English 2 essay (ass 1)
Edchewgroup
btech project 02 report
Synopsis 4 kenneth
Synopsis 3 geometry of feeling
Synopsis 2 semiotics and architecture
Cognitiv essay
Axxu group
Final case study tropical box house
Topic issue proposal egg crate new
Asian architecture slides
Cnc report
Self concept social psychology journal 01 #1 compile
Social psy presentation slide 1 new
Psy final report
Self serving bias social psychology journal 01 #2
The effect of color social psychology journal 01 #3
Psychology
Self concept social psychology journal 01 #1
Psycho journal 02 latest
English 2 essay (ass 1)

Recently uploaded (20)

PDF
My India Quiz Book_20210205121199924.pdf
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PPTX
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
PDF
advance database management system book.pdf
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PPTX
Introduction to pro and eukaryotes and differences.pptx
DOCX
Cambridge-Practice-Tests-for-IELTS-12.docx
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
Environmental Education MCQ BD2EE - Share Source.pdf
PPTX
Core Concepts of Personalized Learning and Virtual Learning Environments
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PDF
English Textual Question & Ans (12th Class).pdf
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
Mucosal Drug Delivery system_NDDS_BPHARMACY__SEM VII_PCI.pdf
PDF
Complications of Minimal Access-Surgery.pdf
PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
PPTX
Education and Perspectives of Education.pptx
PDF
Empowerment Technology for Senior High School Guide
PDF
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 1).pdf
My India Quiz Book_20210205121199924.pdf
AI-driven educational solutions for real-life interventions in the Philippine...
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
advance database management system book.pdf
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
Unit 4 Computer Architecture Multicore Processor.pptx
Introduction to pro and eukaryotes and differences.pptx
Cambridge-Practice-Tests-for-IELTS-12.docx
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
Environmental Education MCQ BD2EE - Share Source.pdf
Core Concepts of Personalized Learning and Virtual Learning Environments
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
English Textual Question & Ans (12th Class).pdf
A powerpoint presentation on the Revised K-10 Science Shaping Paper
Mucosal Drug Delivery system_NDDS_BPHARMACY__SEM VII_PCI.pdf
Complications of Minimal Access-Surgery.pdf
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
Education and Perspectives of Education.pptx
Empowerment Technology for Senior High School Guide
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 1).pdf

Final report bsc 2

  • 1. SCHOOL OF ARCHITECTURE , BUILDING & DESIGN BACHELOR OF SCIENCE ( ARCHITECTURE ) BUILDING SCIENCE 2 [ BLD 61303 ] PROJECT 2 - INTEGRATION PROJECT TUTOR - MR AZIM CHIA WEE MIN 0315186
  • 2. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 TABLE OF CONTENT 1.0 Introduction To Studio Design 2.0 Lighting 2.1 Artificial Lighting For Discussion Room 2.2 Artificial Lighting For Cafe 2.3 Ecotect for Cafe 2.4 PSALI for Discussion Room 2.5 PSALI for Cafe 3.0 Acoustic 3.1 Reverberation Time for Discussion Room 3.2 Sound Reduction Index for Cafe
  • 3. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 1.0 INTRODUCTION TO STUDIO DESIGN NAME COMMUNITY LIBRARY IN SENTUL LOCATION JALAN HAJI SALLEH FUNCTION FUNCTIONED AS A COMMUNITY LIBRARY BUT ALSO REACT WITH PUBLIC REALM DESIGN STATEMENT LIBRARY AREA AROUND 1800 M2 TO 2000 M2
  • 4. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 2.0 ARTIFICIAL LIGHTING 2.1 ARTIFICIAL LIGHTING FOR DISCUSSION ROOM ( 2ND FLOOR )
  • 5. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 DISCUSSION ROOM LIGHT TYPE ( Philips Down Light ) General Specs Application Down light Color White Material Aluminum & Synthetics Lamp Base & wattage LED 12 W Color Temperature 2700K, 6500K Dimensions ( L x W x H ) 132 x 132 x 81 mm Lumen 1680 lm Dimension Of Zone (m) 5 x 3 Total Floor Area / A (m2) 15 m2 Type Of Lighting Fixture Ceiling Lumen Of Lighting Fixtures / F (Lm) 1680 Lm Height Of Luminaire (M) 3.4 m Work Level (M) 0.8 m Component Material Colour Surface Finishes Reflectance Value ( %) Wall Concrete Dark Grey Matte 15 Clear Glass Transparent Glossy 8 Aluminium Frame Black Matte 10 Door Glass Door Transparent Glossy 8 Aluminium Frame Black Matte 10 Floor Laminated Wood Parquet Light Brown Glossy 35 Furniture Wooden Chair Brown Matte 30 Wooden Table Brown Matte 30
  • 6. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 Mounting Height / H ( Hm) 2.6 m Assumption Of Reflectance Value Ceiling = 0.7 Wall = 0.5 Floor = 0.2 Room Index / RI 𝑅𝐼 = ( 𝐿 × 𝑊 ) 𝐻𝑚 ( 𝐿 + 𝑊 ) 𝑅𝐼 = (15) 2.6 (5 + 3 ) = 0.72 Utilization Factor / UF 0.34 Maintenance Factor / MF 0.8 Illuminance Level / E ( Lux ) ( Ms1525 ) 150 Number Of Lighting Fixture / N 𝑁 = 𝐸 × 𝐴 ( 𝐹 × 𝑈𝐹 × 𝑀𝐹 ) 𝑁 = 150 × 15 ( 1680 × 0.34 × 0.8 ) = 5 Fitting layout by approximately / m Smax = 1.0 x Hm = 1.0 x 2.6 = 2.6 m
  • 7. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 2.2 ARTIFICIAL LIGHTING FOR CAFE ( FIRST FLOOR )
  • 8. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 CAFE LIGHT TYPE ( Philips Down Light ) General Specs Application Down light Color White Material Aluminum & Synthetics Lamp Base & wattage LED 12 W Color Temperature 2700K, 6500K Dimensions ( L x W x H ) 132 x 132 x 81 mm Lumen 1680 lm Dimension Of Zone (m) 7.3 x 14 Total Floor Area / A (m2) 102.2 m2 Type Of Lighting Fixture Ceiling Lumen Of Lighting Fixtures / F (Lm) 1680 Lm Height Of Luminaire (M) 3.4 m Work Level (M) 0.8 m Component Material Colour Surface Finishes Reflectance Value ( %) Wall Concrete Dark Grey Matte 15 Clear Glass Transparent Glossy 8 Aluminium Frame Black Matte 10 Door Glass Door Transparent Glossy 8 Aluminium Frame Black Matte 10 Floor Laminated Wood Parquet Light Brown Glossy 35 Furniture Wooden Chair Brown Matte 30 Wooden Table Brown Matte 30
  • 9. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 Mounting Height / H ( Hm) 2.6 m Assumption Of Reflectance Value Ceiling = 0.7 Wall = 0.5 Floor = 0.2 Room Index / RI 𝑅𝐼 = ( 𝐿 × 𝑊 ) 𝐻𝑚 ( 𝐿 + 𝑊 ) 𝑅𝐼 = (102.2) 2.6 (7 + 14 ) = 2.2 Utilization Factor / UF 0.46 Maintenance Factor / MF 0.8 Illuminance Level / E ( Lux ) ( Ms1525 ) 100 Number Of Lighting Fixture / N 𝑁 = 𝐸 × 𝐴 ( 𝐹 × 𝑈𝐹 × 𝑀𝐹 ) 𝑁 = 100 × 102.2 ( 1680 × 0.46 × 0.8 ) = 17 Fitting layout by approximately / m Smax = 1.0 x Hm = 1.0 x 2.6 = 2.6 m
  • 10. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 2.3 ECOTECT FOR CAFE ( FIRST FLOOR ) DAYTIME ARTIFICIAL LIGHT According to diagram above, area near the front and back received more natural daylight compare to the middle part. Hence the intensity is the highest According to diagram above, it shows that from blue to yellow represents the intensity of light from low to high and the brightest is in the middle of the cafe as there will not receive any natural daylight. Hence, the artificial lights focus on the middle part of the cafe.
  • 11. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 2.4 PSALI FOR DISCUSSION ROOM ( 2ND FLOOR ) Lighting arrangement for the discussion room. As the discussion room receive natural daylight from 3 faces, the natural daylight that penetrate will lit up half of the discussion room. According to MS1525, discussion room requires 150 Lux and therefore min 5 nos of lights are required. For this discussion room, there are 6 nos of lights placed and controlled by two switches. During daytime, as half of the discussion room will receive the natural daylight, only switch 2 is switched on to get enough luminance for the discussion room. During night time, the space will not get any natural daylight so all of the lights are switched on. This layout arrangement for the lighting is to reduce the amount of energy waste to lit up the room during day.
  • 12. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 2.5 PSALI FOR CAFE ( FIRST FLOOR ) For cafe, there are 3 switches controlling the lights . during daytime, switch 1 and switch 3 can be switched off as there are natural daylight penetrating into the space. As for night time, all the lights are on as there will be no natural daylight penetrating into the space. Lighting arrangement for cafe. As the cafe receive natural daylight at the front and back , the natural daylight that penetrate through will lit up the front and back part of the cafe while the middle part of the cafe will receive minimum daylight. According to MS1525, cafe requires 100 Lux and therefore min 17 nos of lights are required. For the cafe, there are 18 nos of lights and 3 switches controlling 6 light each.
  • 13. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 3.0 ACOUSTIC 3.1 REVERBERATION TIME FOR DISCUSSION ROOM ( 2nd FLOOR ) Volume for Discussion Room = 5m x 3m = 15 m2
  • 14. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 REVERBERATION TIME (DISCUSSION ROOM) at 500 Hz during NON PEAK Volume for Discussion Room = 15 x 4 = 60 m3 𝑅𝑇 = 0.16 × 𝑉𝑜𝑙𝑢𝑚𝑒𝑜𝑓𝑠𝑝𝑎𝑐𝑒 𝐴𝑏𝑠𝑜𝑟𝑝𝑡𝑖𝑜𝑛𝑎𝑟𝑒𝑎 𝑅𝑇 = 0.16 × 60 9.948 𝑅𝑇 = 𝟎. 𝟗𝟕𝒔 The reverberation time for Discussion Room at 500 Hz for non-peak hour with 4 persons occupying the space is 0.97 s which falls within the comfort reverberation time between 0.8s - 1.3s. This show that the acoustic absorption within this space is sufficient. Component Material Absorption Coefficient ( 500 Hz ) , S Area ( m2 ), A Sound Absorption ( SA ) Wall Concrete 0.05 12 0.6 Clear Glass 0.1 29.6 2.96 Aluminum Frame 0.25 2.4 0.6 Door Glass Door 0.1 21.6 2.16 Aluminum Frame 0.25 0.84 0.21 Floor Laminated Wood Parquet 0.07 15 1.05 Furniture Wooden Chair 0.1 2.4 0.24 Wooden Table 0.1 2.88 0.288 Occupant ( non Peak ) 0.46 4 1.84 Total Absorption 9.948
  • 15. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 REVERBERATION TIME (DISCUSSION ROOM) at 500 Hz during PEAK Component Material Absorption Coefficient ( 500 Hz ) , S Area ( m2 ), A Sound Absorption ( SA ) Wall Concrete 0.05 12 0.6 Clear Glass 0.1 29.6 2.96 Aluminum Frame 0.25 2.4 0.6 Door Glass Door 0.1 21.6 2.16 Aluminum Frame 0.25 0.84 0.21 Floor Laminated Wood Parquet 0.07 15 1.05 Furniture Wooden Chair 0.1 2.4 0.24 Wooden Table 0.1 2.88 0.288 Occupant ( Peak ) 0.46 8 3.68 Total Absorption 11.788 Volume for Discussion Room = 15 x 4 = 60 m3 𝑅𝑇 = 0.16 × 𝑉𝑜𝑙𝑢𝑚𝑒𝑜𝑓𝑠𝑝𝑎𝑐𝑒 𝐴𝑏𝑠𝑜𝑟𝑝𝑡𝑖𝑜𝑛𝑎𝑟𝑒𝑎 𝑅𝑇 = 0.16 × 60 11.79 𝑅𝑇 = 𝟎. 𝟖𝟏𝒔 The reverberation time for Zone 1 at 500 Hz for peak hour with 8 persons occupying the space is 0.81 s which falls within the comfort reverberation time between 0.8s - 1.3s. This shows that the acoustic absorption within this space is sufficient.
  • 16. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 REVERBERATION TIME (DISCUSSION ROOM) at 2000 Hz during NON PEAK Component Material Absorption Coefficient ( 2000 Hz ) , S Area ( m2 ), A Sound Absorption ( SA ) Wall Concrete 0.05 12 0.6 Clear Glass 0.07 29.6 2.072 Aluminum Frame 0.25 2.4 0.6 Door Glass Door 0.07 21.6 1.512 Aluminum Frame 0.25 0.84 0.21 Floor Laminated Wood Parquet 0.06 15 0.9 Furniture Wooden Chair 0.1 2.4 0.24 Wooden Table 0.1 2.88 0.288 Occupant ( non Peak ) 0.51 4 2.04 Total Absorption 8.462 Volume for Discussion Room = 15 x 4 = 60 m3 𝑅𝑇 = 0.16 × 𝑉𝑜𝑙𝑢𝑚𝑒𝑜𝑓𝑠𝑝𝑎𝑐𝑒 𝐴𝑏𝑠𝑜𝑟𝑝𝑡𝑖𝑜𝑛𝑎𝑟𝑒𝑎 𝑅𝑇 = 0.16 × 60 8.46 𝑅𝑇 = 𝟏. 𝟏𝟑𝒔 The reverberation time for Zone 1 at 2000 Hz for non-peak hour with 4 persons occupying the space is 1.13 s which falls within the comfort reverberation time between 0.8s - 1.3s. This shows that the acoustic absorption within this space is sufficient.
  • 17. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 REVERBERATION TIME (DISCUSSION ROOM) at 2000 Hz during PEAK Volume for Discussion Room = 15 x 4 = 60 m3 𝑅𝑇 = 0.16 × 𝑉𝑜𝑙𝑢𝑚𝑒𝑜𝑓𝑠𝑝𝑎𝑐𝑒 𝐴𝑏𝑠𝑜𝑟𝑝𝑡𝑖𝑜𝑛𝑎𝑟𝑒𝑎 𝑅𝑇 = 0.16 × 60 10.502 𝑅𝑇 = 𝟎. 𝟗𝟏𝒔 The reverberation time for Zone 1 at 2000 Hz for peak hour with 8 persons occupying the space is 0.91 s which falls within the comfort reverberation time between 0.8s - 1.3s. This shows that the acoustic absorption within this space is sufficient. Component Material Absorption Coefficient ( 2000 Hz ) , S Area ( m2 ), A Sound Absorption ( SA ) Wall Concrete 0.05 12 0.6 Clear Glass 0.07 29.6 2.072 Aluminum Frame 0.25 2.4 0.6 Door Glass Door 0.07 21.6 1.512 Aluminum Frame 0.25 0.84 0.21 Floor Laminated Wood Parquet 0.06 15 0.9 Furniture Wooden Chair 0.1 2.4 0.24 Wooden Table 0.1 2.88 0.288 Occupant (Peak ) 0.51 8 4.08 Total Absorption 10.502
  • 18. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 3.2 SOUND REDUCTION INDEX FOR CAFE ( FIRST FLOOR ) Sound reduction index (SRI) is used to measure the level of sound insulation provided by structure such as wall, window, door, or ventilator.
  • 19. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 TRANSMISSION LOSS (CAFE) Transmission Coefficient of material, Building Element Material Surface Area (m2 ) SRI (dB) Wall Concrete 101.7 42 Window Clear Glass 46 26 Aluminum Frame 2 44 Door Glass Door 43.8 26 Aluminum Frame 3.6 44 𝑆𝑅𝐼 = 10 𝑙𝑜𝑔 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑐𝑜𝑒𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑡 1. Concrete Wall 𝑆𝑅𝐼 = 10 𝑙𝑜𝑔 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑤𝑎𝑙𝑙 42 = 10 𝑙𝑜𝑔 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑤𝑎𝑙𝑙 log 4.2 = 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑤𝑎𝑙𝑙 𝑻𝒓𝒂𝒏𝒔𝒎𝒊𝒔𝒔𝒊𝒐𝒏𝑾𝒂𝒍𝒍 = 𝟔. 𝟑𝟏 × 𝟏𝟎−𝟓 2. Clear Glass Wall 𝑆𝑅𝐼 = 10 𝑙𝑜𝑔 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑔𝑙𝑎𝑠𝑠𝑤𝑎𝑙𝑙 26 = 10 𝑙𝑜𝑔 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑔𝑙𝑎𝑠𝑠𝑤𝑎𝑙𝑙 log 2.6 = 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑔𝑙𝑎𝑠𝑠𝑤𝑎𝑙𝑙 𝑻𝒓𝒂𝒏𝒔𝒎𝒊𝒔𝒔𝒊𝒐𝒏𝑮𝒍𝒂𝒔𝒔𝑾𝒂𝒍𝒍 = 𝟐. 𝟓𝟏 × 𝟏𝟎−𝟑 3. Aluminum Frame Wall 𝑆𝑅𝐼 = 10 𝑙𝑜𝑔 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑤𝑖𝑛𝑑𝑜𝑤𝑓𝑟𝑎𝑚𝑒 44 = 10 𝑙𝑜𝑔 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑤𝑖𝑛𝑑𝑜𝑤𝑓𝑟𝑎𝑚𝑒 log 4.4 = 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑤𝑖𝑛𝑑𝑜𝑤𝑓𝑟𝑎𝑚𝑒 𝑻𝒓𝒂𝒏𝒔𝒎𝒊𝒔𝒔𝒊𝒐𝒏𝑾𝒊𝒏𝒅𝒐𝒘𝑭𝒓𝒂𝒎𝒆 = 𝟑. 𝟗𝟖 × 𝟏𝟎−𝟓
  • 20. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 4. Glass Door 𝑆𝑅𝐼 = 10 𝑙𝑜𝑔 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑔𝑙𝑎𝑠𝑠𝑑𝑜𝑜𝑟 26 = 10 𝑙𝑜𝑔 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑔𝑙𝑎𝑠𝑠𝑑𝑜𝑜𝑟 log 2.6 = 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑔𝑙𝑎𝑠𝑠𝑑𝑜𝑜𝑟 𝑻𝒓𝒂𝒏𝒔𝒎𝒊𝒔𝒔𝒊𝒐𝒏𝑮𝒍𝒂𝒔𝒔𝑫𝒐𝒐𝒓 = 𝟐. 𝟓𝟏 × 𝟏𝟎−𝟑 5. Aluminum Frame Door 𝑆𝑅𝐼 = 10 𝑙𝑜𝑔 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑑𝑜𝑜𝑟𝑓𝑟𝑎𝑚𝑒 44 = 10 𝑙𝑜𝑔 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑑𝑜𝑜𝑟𝑓𝑟𝑎𝑚𝑒 log 4.4 = 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑑𝑜𝑜𝑟𝑓𝑟𝑎𝑚𝑒 𝑻𝒓𝒂𝒏𝒔𝒎𝒊𝒔𝒔𝒊𝒐𝒏𝑫𝒐𝒐𝒓𝑭𝒓𝒂𝒎𝒆 = 𝟑. 𝟗𝟖 × 𝟏𝟎−𝟓
  • 21. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 SOUND REDUCTION INDEX CALCULATION (CAFÉ) 𝑆𝑅𝐼 = 10 𝑙𝑜𝑔 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑜𝑣𝑒𝑟𝑎𝑙𝑙 𝑇𝑜𝑣𝑒𝑟𝑎𝑙𝑙 = 𝑆 𝑛 ∗ 𝑇𝑛 𝑇𝑜𝑡𝑎𝑙 𝑠𝑢𝑟𝑓𝑎𝑐𝑒 𝑎𝑟𝑒𝑎 𝑇𝑜𝑣𝑒𝑟𝑎𝑙𝑙 = 6.42 × 10−4 + 1.15 × 10−1 + 7.96 × 10−5 + 1.10 × 10−1 + 1.43 × 10−4 197.1 = 1.15 x 10 -3 𝑆𝑅𝐼 = 10 𝑙𝑜𝑔 1 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛𝑜𝑣𝑒𝑟𝑎𝑙𝑙 𝑆𝑅𝐼 = 10 𝑙𝑜𝑔 1 1.15 × 10−3 𝑆𝑅𝐼 = 10 log 1 1.15 × 10−3 SRI = 29.4 dB Based on the calculation, the sound reduction index value of the whole open space of the cafe is 29.4 dB. Sound Reduction Index Hearing Conditions 35 dB or less Normal speech can be understood quite easily and distinctly through the walls 35 to 40 dB Loud speech can be understood fairly well. Normal speech can be heard but not easily understood 40 to 45 dB Loud speech can be heard, but it is not easily intelligible. Normal speech can be heard only faintly, if at all. Material SRI ( dB ) Surface area ( m2 ) ( S) Transmission Coefficient ( T) ST Concrete 42 101.7 6.31 x 10 -5 6.42 x 10 -4 Clear glass 26 46 2.51 x 10 -3 1.15 x 10 -1 Aluminum Frame 44 2 3.98 x 10 -5 7.96 x 10 -5 Glass Door 26 43.8 2.51 x 10 -3 1.10 x 10 -1 Aluminum Frame 44 3.6 3.98 x 10 -5 1.43 x 10 -4 197.1
  • 22. Building Science 2 Project 2 Integration Project Chia Wee Min 0315186 45 to 50 dB Loud speech can be faintly heard but not understood. Normal speech is inaudible 55 dB or greater Very loud sounds, such as loud singing, brass musical instruments or a radio at full volume can be heard faintly or not at all. According to the general sound environment, the value is categorized as less than 35dB which is loud according to the normal conversation and can be heard distinctly through the walls. This cafe spaces uses variety of materials such as concrete, glass, and aluminum. To be able to achieve better acoustic absorption, the balance use of effective materials is important, it helps the overall reduction of sound transmission between spaces.